The 4 ton/h oil fired steam boiler production for our Egypt customer has finished. This boiler is used for the paper factory.


The paper making production line needs about the 3 ton/h boiler working at 1.0Mpa and 24 hours working. Considering this condition, our engineer advice the customer choose the 4 ton/h 1.25Mpa steam boiler.


The steam from the boiler is used for the process of drying the paper. The high temperature steam flows into the drying chamber to dry the half-finished paper.


The condensation type steam boiler is designed with the condenser in the boiler proper. Thus it can save installation space and make use of more fuel energy.